Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3958.65
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Nov 09, 2022     Alternate air door; Baffles - (3.2 hours)       Category: Firewall Forward
1. Installed the inboard nutplates under the cover plate for the air filter holder. Added two more rivets on each of the air filter angles to give them more stability.
2. Finished final-drilling and deburring all holes in the L front baffle components. Tweaked the fit of the attach angles for the forward baffles.
3. Installed the four nutplates on the #2 cylinder baffle that will attach to the the L front floor.
4. Cut off the excess lower part of the #2 cylinder baffle that will not be used because of my revised design. Bent the forward edge of the baffle at a 5-degree angle inward.
5. Cleaned and primed the interface sides of the air filter holder z-channels.
6. Sanded last night's filler. Added some more filler to few big divots.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.